LPP2: Site Allocations and Development Management Policies

The Need for Additional Pitches in Waverley at 1 April 2020

7.32  Since 1 April 2017, a number of planning permissions have been granted and contribute to meeting the need identified in the TAA. As a result, the residual need to be met through allocations in Local Plan Part 2, is for 17 further pitches.